Loading the map…
Construction of other civil engineering projects n.e.c. · Haywards Heath, West Sussex
Silvabak Construction
Silvabak Construction Limited
Private limited company registered in Haywards Heath, classed under “Construction of other civil engineering projects n.e.c.”.
Headline figures
FY to May 2025 · Company only
Turnover
For subscribers
Profit after tax
—
Not filed: small-company exemption
Net assets
For subscribers
Cash
For subscribers
Employees
For subscribers
Retained reserves
For subscribers
What the numbers say
2 findings from the figures, in plain English
Written by rules from the figures on this page. Not a forecast or a credit opinion.
History
| £ | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Profit after tax | — | ||||
| Turnover | |||||
| Net assets | |||||
| Cash | |||||
| Employees | |||||
| Retained reserves |
Every figure for all 5 years
“—” means we did not find the figure in a source; it is never filled with an estimate.
Balance sheet and ratios
From the filed balance sheets · £
| Balance sheet | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| Fixed assets | ||||
| Current assets | ||||
| of which debtors | ||||
| of which cash | ||||
| Creditors due within a year | ||||
| Net current assets | ||||
| Net assets | ||||
| Ratios | ||||
| Current ratioCurrent assets for every £1 owed within a year | ||||
| Cash ratioCash for every £1 owed within a year | ||||
| Creditors to assetsEverything owed to creditors as a share of fixed plus current assets | ||||
7 balance-sheet lines and 3 ratios, every year
A ratio appears only for years where every line it needs was filed. Lines are as tagged in the accounts; nothing is added up or estimated.
Timeline
Checked 2026-10-21
- AccountsMicro company accounts made up to 31 May 2025
- AccountsMicro company accounts made up to 31 May 2024
- OwnershipChange of details for Mr Jack Alexander William Crisp as a person with significant control on 12 March 2024
- DirectorsDirector's details changed for Mr Jack Alexander William Crisp on 12 March 2024
- OwnershipChange of details for Mr Jack Alexander William Crisp as a person with significant control on 21 December 2023
- AddressRegistered office address changed from 19/21 Swan Street West Malling Kent ME19 6JU England to C/O Digivolve Accountants Delta House Bridge Road Haywards Heath West Sussex RH16 …
- DirectorsDirector's details changed for Mr Jack Alexander William Crisp on 21 December 2023
- OwnershipWithdrawal of the persons' with significant control register information from the public register
- AccountsTotal exemption full accounts made up to 31 May 2023
- AccountsTotal exemption full accounts made up to 31 May 2022
- AccountsTotal exemption full accounts made up to 31 May 2021
- AccountsTotal exemption full accounts made up to 31 May 2020
5 earlier
- OwnershipChange of details for Mr Jack Alexander William Crisp as a person with significant control on 5 March 2021
- DirectorsDirector's details changed for Mr Jack Alexander William Crisp on 5 March 2021
- OwnershipChange of details for Mr Jack Alexander William Crisp as a person with significant control on 31 January 2020
- DirectorsDirector's details changed for Mr Jack Alexander William Crisp on 31 January 2020
- IncorporationIncorporation
- Ownership
From the Companies House filing history. Routine confirmation statements are left out, and a run of the same filing is shown once.
Questions people ask
›What does Silvabak Construction do?
Private limited company registered in Haywards Heath, classed under “Construction of other civil engineering projects n.e.c.”.
›How much turnover does Silvabak Construction make?
Answered in the full report
›Is Silvabak Construction profitable?
Silvabak Construction's profit isn't public: small companies may file without a profit and loss account.
›How many people work at Silvabak Construction?
Answered in the full report
›Who runs and owns Silvabak Construction?
Answered in the full report
›Where is Silvabak Construction based?
Its registered office is C/O Digivolve Accountants Delta House, Bridge Road, Haywards Heath, West Sussex, RH16 1UA, in Haywards Heath, West Sussex.
›When was Silvabak Construction founded?
Silvabak Construction Limited was incorporated on 16 May 2019.
›Is Silvabak Construction still trading?
The register lists Silvabak Construction Limited as active.